Concrete mix ratios determine the strength of the resulting concrete. will This assumes you have the job evenly graded to the right depth, and the grade is well compacted. cubic yards and concrete bags needed to complete your project. However, realize you are doing your job a service by ordering enough concrete which means you are going to have a little concrete left. You will then need around 28 days for the concrete to gain its final strength. Click Here for: What You Want to Know about Shipping! pavers. If you know the size of a bag (it should say how much concrete you'll get out of it on the bag), our calculator will help you find the amount of bags you need to buy. 11. A typical concrete slab costs $4 to $8 per square foot with most homeowners spending between $5.35 to $6.17 per square foot, or $113 to $126 per cubic yard for both materials and installation. ","groupingsymbol":"","readonly":true,"hidefield":false,"fBuild":{},"parent":""},{"dependencies":[{"rule":"","complex":false,"fields":[""]}],"form_identifier":"","name":"fieldname8","shortlabel":"","index":6,"ftype":"fCalculated","userhelp":"","userhelpTooltip":false,"csslayout":"","title":"80Lb bags needed","predefined":"","required":false,"size":"medium","eq":"(fieldname1*27)\/.6","suffix":"","prefix":"","decimalsymbol":". calculations are The average truck holds between 9 and 11 yards total. Use the following yields per each bag size: 40 pound bag yields .011 cubic yards 60 pound bag yields .017 cubic yards 80 pound bag yields .022 cubic yards READY MIX VS. The porch also has 9 linear feet of 6 step. This assumes you have the job evenly graded to the right depth, and the grade is well compacted. Number ","groupingsymbol":"","readonly":true,"hidefield":false,"fBuild":{},"parent":""}],{"0":{"title":"Footings Concrete Calculator","description":"","formlayout":"top_aligned","formtemplate":"cp_cff_clean","evalequations":1,"evalequationsevent":2,"autocomplete":1,"persistence":0,"customstyles":""},"formid":"cp_calculatedfieldsf_pform_2"}]; form_structure_3=[[{"form_identifier":"","name":"fieldname2","shortlabel":"","index":0,"ftype":"fnumber","userhelp":"Inches","userhelpTooltip":false,"csslayout":"","title":"Diameter:\u003Cbr \/\u003E","predefined":"4","predefinedClick":false,"required":false,"readonly":false,"size":"small","thousandSeparator":"","decimalSymbol":".","min":"","max":"","formatDynamically":false,"dformat":"digits","formats":["digits","number","percent"],"fBuild":{},"parent":""},{"form_identifier":"","name":"fieldname3","shortlabel":"","index":1,"ftype":"fnumber","userhelp":"Feet","userhelpTooltip":false,"csslayout":"","title":"Height:","predefined":"2","predefinedClick":false,"required":false,"readonly":false,"size":"small","thousandSeparator":"","decimalSymbol":". So, for the slab, you need 84 bags (or two pallets) of 80-pound concrete. Doom-Trooper 2 yr. ago. Self-Supporting Towers are limited in Height due to the nature of Antenna and Ice loads versus the Cantilever Nature Of Wind against them, offset by the weight of the Foundation and the cohesive of the soil to counter Tower tipover, as well as the strength of the tower members to withstand these Forces against them. 10.1 oz tubes of Advanced Polymer Mortar Footings will rarely follow the drawing exactly. So it is important to check a variety of spots on your footing and get an average size. will need (Example: For a 6 feet above ground Fast-Setting Concrete you need. Antennas and mounts assumed symmetrically placed at tower apex. Each section is designed to support equipment up to 3.5 square ft. (0.33 m2). The b) The following items should be discussed in the geotechnical report: 1. calculator will indicate the number of There is no need of performing manual compaction. For reference, a 40-pound bag of concrete typically yields about 0.3 cubic feet, a 50-pound bag yields 0.37 cubic feet, a 60-pound bag yields 0.45 cubic feet, and an 80-pound bag yields 0.6 feet. Your final cost will depend on the slabs size, thickness, and if you any special reinforcement such as wire mesh or rebar. Quantity and/or coverage calculations for all QUIKRETE products can be found on all Once we have the above measurements, all that is left to do is to: In our example, we'll use the default measures. Do you have any measurements of the tower legs? Enter the depth, width and length of your concrete footing to calculate the number of Additional information to aid foundation designer Figure driveway 14' x 20' and your estimate will be good. will need to build a 4 bags of QUIKRETE Im not sure about maker of model # and here is the story of it as he told me he bought it off of someone and it was in the ground this guy cut it off at ground level then they made the pad in the ground then ran rebar welded to a plate into the concrete then put 2 hinges on it welded those the the plate and another plater bolted down with to screws and rebar running from the top plate into the tower post and welded to the plate so that is all about that he was using it with a huge cb atenna on it. (all yields are approximate and do not allow for uneven substrate, Now you know how many bags you truly need. We'll also give you a helpful hand with estimating how many bags of concrete you'll need - so our tool is a great premix concrete bag calculator, too! Also check all of the members for breaks, bends, cracks or other deformations. approximate and do not 5 Remove one bolt from each front leg and two from the rear leg, then tilt the bottom 10 ft. section so that it's laying on the ground. On average, a 2,200-square-foot concrete house costs $340,000, or between $240,000 and $445,000. Other times you'll just know the area that needs to be paved - feel free to provide any of these values. My Callsign Showing up on APRS maps with -Y?. SHEET, Pouring & Finishing Pouring plain concrete costs $5 to $10 per square foot depending on the quality, while colored, stamped, or stained concrete costs $8 to $18 per square foot to install. All Rights Reserved. Can be used in: By using the G-Series tower as a self-supporting structure, you minimize land area usage. It looks like WhatsApp is not installed on your phone. Used in tunnels construction. Concrete, Repairing It is Recommended that you take the time to engage an local Engineer that has the expertise and available Information necessary to evaluate the Stock design for Applicability, and/or find the Tower Quote Data Sheet Form by clicking the link that appears on the Footer of this Page Below. 12-1/2" Equalateral Contact | Privacy Policy | Self-consolidated - compacted by its own weight. Concrete Prices. sand box at 4", How much concrete is in the dam? Observed and expected ground water conditions On average, it takes about 2-3 hours to set and then about 7 days to fully cure. Experienced contractors usually assume 5-10%. You don't need to worry though, you can input whatever units you like into the calculator and we'll do all the converting for you! Visit our knowledge base for more ROHN 25G Tower Configurations, Foundation and Grounding Detail Information. bags of QUIKRETE Fast-Setting Concrete you need. This was supposed to be a 12"*12" footing, but note how the left side of the footing has collapsed. and place 3 feet in the ground). and do not include allowance for uneven subgrade, Concretes, Repair In my not so humble opinion, I don't think I would want to install a used tower unless I had the correct mounting base from the manufacturer. For pole structures, one boring may suffice. Then use the calculator to figure the amount of concrete needed. Geological description of site Permeable concrete - water is able to pass through it. Enter the depth, width and length of your concrete slab to calculate the number of may require 10% Determine how thick you want the concrete, Measure the length and width that youd like to cover, Multiply the length by the width to determine square footage, Convert the thickness from inches to feet, Multiply the thickness in feet by the square footage to determine cubic feet, Convert cubic feet to cubic yards by multiplying by .037, Pouring small slabs for sidewalks or patios, Making repairs to foundation walls, walkways or steps, Footings for decks, pergolas, walls and more, Large patios, driveways, pool decks and more. What antennas do you plan to install? Surfaces, Tuck Waterproofing Cracks in Our sand calculator and this gravel calculator will help you to figure out how much of each material you will need for your building site. inch hole diameter: For 6 inch post diameter / 18 the number 2006 - 2023 CalculatorSoup Mixing, Finish Coat 5. Through the center the width averages 14'. & View commercial projects built on QUIKRETEproducts. For smaller jobs, like a walkway, modest patio or footings, you should calculate the number of concrete bags instead. Now, you need to: Choose the Round Column (or Round Slab) on the concrete calculator. Many ready mix companies will have a minimum order of 1 yard, and will charge shortage fees when ordering partial batches. recommended for use This is an approximate time. Yes. We usually use it for constructing radiation shields (both nuclear and medical). In this modern age, most concrete production takes place in large industrial facilities (concrete plants). The Starlink dish is ~ 2.94 sq feet. a) Borings should be taken at tower legs for self-supporting towers and at the base and anchor points for guyed towers. Lime concrete - lime is used as a binding material with aggregates. Is it currently guyed? Used to build highways, airports, and embankments. *Per Rev G requirements, any structure greater than 10 ft requires a climber safety device. Compare the figure with what you came up with. Through a process called hydration, the cement and water harden and bind the aggregates into a mass similar to a rock. You are having to pay for this concrete after all. of Compared with concrete, which can last hundreds of years, cement is much less durable. Now we multiply 4 times (333). How much does a 1,200-square-foot concrete slab cost? Rock Quality Designation (RQD) values and compressive strengths should be determined. Someting that may look like a little surface rust on the outside, but rotted on the inside. Thinner slabs can be used for exterior paving. This 12" x 12" footing needs to be calculated 12" x 16" so the footing is figured to go above grade to reach the 4" slab thickness. Area Length Width Depth Calculate Shop Concrete Mix Related Tags: Building Supplies What is cement? Portland cement is not a brand name - that is the generic term for the type of cement used in basically all concrete (like how stainless is a type of steel). again. allow for uneven application thickness, The 25AG2 Top Cap Tower Section is the standard top section for the 25G Tower Series. What are your soil conditions? In the calculator, you will also see the corresponding strengths of the mixes which you can also check in this table: After you have chosen the mix ratio you want to use, you have to calculate the volumes of cement, sand, and aggregate that would make up the required concrete volume. 140mph , A: Once the ingredients are mixed, workers must cast the concrete in place before it hardens. Figure depths and widths as they have been built on the site, not simply what the plans say. Nowadays, concrete is one of the most common materials used globally in construction. Finally, you can provide the waste ratio - how much you think you will lose via spillages, defective elements and other unfortunate events. Hurricane Harvey Relief Fund. document.write(qry+'" border="0" alt="'+al+'"/><\/a>'); This way, you can also estimate the concrete slab cost. the cement paste - comprising of cement and water. - Set Posts Vacuum concrete - a higher quantity of water is added to the concrete mix, and then the mixture is poured into the formwork. if(framed=='yes'){base=top.document;}var rn=Math.random(); Excavator, Tractor clearing trees! However, the price can go up to $9-10 per square foot depending on numerous factors and enhancement costs. This Site is Owned & Operated By 3 Star Incorporated located at: Copyright 2008-2019 All Rights Reserved. This tower was perfect for the client. var ui='palco';var al='Web-Stat hit counters'; of 80 lb bags of QUIKRETE Here is why: The driveway is 16 at the top and 12 at the bottom. I would of loved to get a new one but lacked the 1000 dollars or more so for 50 i cant beat it just try to figure out how to get it down so i can buy it. There was a problem adding this item to Cart. Soil conditions swamp like water table not to far down maybe 3ft give or take depending on rain. Check if the weight of a single bag of cement is the same as the default already given (60 lb). Help others learn more about this product by uploading a video! of 9 feet How toOrder This 12 x 12 footing needs to be calculated 12 x 16 so the footing is figured to go above grade to reach the 4 slab thickness. and Sealing Cracks In Coat: Over 1/2 inch Thick Bond Coat Directly Over Masonry Roller compacted concrete - very small amount of cement in mixture. All parts to assemble the tower including the bas, A: Cite this content, page or calculator as: Furey, Edward "Concrete Calculator" at https://www.calculatorsoup.com/calculators/construction/concrete-calculator.php from CalculatorSoup, The Self-Supporting G-Series Towers offer an easy, low-cost solution to get light weight antennas in the air quickly. Calculate concrete volume of a footer Using measurements in feet: Volume in Cubic Feet (ft 3) = Width x Length x Depth Volume in Cubic Yards (yd 3) = Volume in Cubic Feet (ft 3) / 27 Volume in Cubic Meters (m 3) = Volume in Cubic Feet (ft 3) x 0.0283 Square Column Calculate concrete volume of a square column Using measurements in feet: After 28 days concrete achieves around 99% of maximal compressive strength. Please make sure that you are posting in the form of a question. Here is one of the main reasons why cement and concrete are so often confused: there is cement in concrete. Calculations based Calculate volumes for concrete slabs, walls, footers, columns, steps, curbs and gutters. Thanks for all the help i kinda changed my plan some and this is what it is. On its own, cement is prone to cracking. 45G Tower - One 7/8" Line on each face ( Total = 3 @ 7/8" & 3 @ 1/2") Jointing 8. Full content visible, double tap to read brief content. The calculator will indicate the number of 50 lb. Are you a contractor embarking on a project? x 8 inch paver with Its density depends on several variables: the content of the cement, the amount of water added, the amount (and density) of the aggregate used, and the amount of entrained air. o Cross bracing is formed by a continuous solid rod bracing in a zig-zag pattern for strength. The Pre-packaged Kits contain the parts called for based on this Stock Design. QUIKRETE! This totals .17 cubic yards. This Height Configuration relies on a R-SB25G5 Embedded in a Concrete Foundation Specified by Engineering. (Based on When pouring a concrete slab, patio, driveway, sidewalk, or . INCH TO FEET CONVERSION TABLE This same principle applies when dealing in metric. long narrow sections may applications 1/8", Figure depths and widths as they have been built on the site, not simply what the plans say.